March 16, 2021 (MLN): Pioneer Cement Limited (PIOC), in an announcement to the Stock Exchange, said that the second turbine 1×12 MW of its newly installed Coal Power Plant having a generation capacity of 24 MW, has started power generation.
Copyright Mettis Link News
Posted on: 2021-03-16T15:21:00+05:00
40224