June 10, 2022 (MLN): In an effort to overcome the ongoing power shortfall, K-Electric (KE) has issued a new load-shedding schedule for up to nine hours in high-loss areas of Karachi with effect from Thursday in line with National Power Policy.
While Karachiites living in low-loss areas are facing three-hour load-shedding daily within KE’s service territory. Earlier, these areas were exempted from load-shedding.
As per media reports, the new load shedding schedule was planned to provide one to two hours relief in high-loss areas where prolonged load-shedding was being observed.
33336