Saturday, July 6, 2024
HomeEquityAttock Cement to install Captive Solar Power Plant at its existing premises

Attock Cement to install Captive Solar Power Plant at its existing premises

June 20, 2019 (MLN): The Board of Directors of Attock Cement Pakistan Limited has approved the installation of Captive Solar Power Plant of 7 MW at its existing factory premises.

Copyright Mettis Link News

Posted on: 2019-06-20T15:32:00+05:00

28492

RELATED ARTICLES
- Advertisment -

Most Popular